Vijayawada-benguluru Expressway

This corridor spans 531 km, passing through Andhra Pradesh and Karnataka. As part of Vijayawada-Benguluru corridor, a new 343 km expressway will be constructed in Andhra Pradesh.

This Corrdior also called as B-K-V corridor (Benguluru-kadapa-Vijayawada),  has been divided into three parts:

  1. From Vijayawada to Muppavaram in Bapatla district, and from Kodikonda in Sri Sathya Sai district to Bengaluru, existing highways will be utilized.

  2. From Muppavaram to Kodikonda, a new access-controlled greenfield expressway will be constructed, essentially a new highway. This expressway has been designated as NH544G                                                                                                 

  1. This expressway will pass through the districts of Bapatla, Prakasam, SPSR Nellore, YSR Kadapa, and Sri Sathya Sai. A video has been created to show the exact route map of the regions it will cover. Please watch the video for more details, friends.

The 6-lane expressway will have 13 interchanges across various locations to allow vehicles to enter and exit. These are called interchanges.

Packages:

This expressway is divided into 14 packages for ease of construction 

                                                                                           

Package

Length & chainage

Contractor

1. Koduru to Vanavolu

24.3 kms (Ch: 0.00 to  24.3km)

Dilip Buildcon

2. Vanavolu to Vankarakunta

21.4 kms (Ch: 24.3 to 45.7 km)

Raj Path Infracon

3. Vankarakunta to Odulapalle

26.3 kms (Ch: 45.7 to 72.0 km)

Raj Path Infracon

4. Odulapalle to Nallacheruvu palli

24.3 kms (Ch: 72.0 to 96.3 km)

Dilip Buildcon

5. Nallacheruvu palli to Yerragudipadu

32.7 kms (Ch: 96.3 to 129.0 km)

MEIL

6. Yerragudipadu to Audireddipalle

31 kms    (Ch: 129.0 to 160.0 km)

MEIL

7. Audireddipalle to Mallapalle

16 kms    (Ch: 160.0 to 176.0 km)

Dilip Buildcon

8. Mallapalle to Kavulakuntla

20 kms    (Ch: 176.0 to 196.0 km)

MEIL

9. Kavulakuntla to Narayanmpeta

7.5 kms   (Ch: 196.0 to 203.5 km)

Max Infra (I) Limited – Bekem Infra Projects Pvt. Ltd. (Consortium)

10. Narayanmpeta to Chandrasekharpuram

24.5 kms (Ch: 203.5 to 228.0 km)

MEIL

11. Chandrasekharapuram to Polavaram

32 kms    (Ch: 228.0 to 260.0 km)

MEIL

12. Polavaram to Marripudi

25.5 kms (Ch: 260.0 to 285.5 km)

MEIL

13. Marripudi to Somavarappadu

29.1 kms (Ch: 285.5 to 314.6 km)

KNR Constructions

14. Somavarappadu to Muppavaram

28.64 kms(Ch: 314.6 to 343.24 km)

MEIL

 Benefits:


This expressway will reduce the Vijayawada-Bengaluru distance by 120 km and the
travel time by 4.5 hours

Over all details:

NH544G

No.of Lanes:6

Right of way: 90m

Entry/Exit Points (Interchanges): 13 nos

Vehicular Restrictions: No Two-wheelers or autos allowed

Service roads: Not available

 Project cost: 20,000Cr